Remote generator switching including regulation by inverters according to SOC
- regulation of PV with a power of 90kWp with an accumulation of 90kWh with an LPG aggregate.
- regulation of PV discharge up to 3x1000L accumulations with a power input of 3x27kW.
- regulation of the entire boiler room, which is LPG, i.e. temperature control, three-way valves between LPG and AKU.
- regulation of the intensity of internal lighting, including external lighting, based on production
- binary control of lighting inside
- switching off individual circuits based on production
- opening gates and doors of individual sections
- regulation based on weather prediction for 24H+
- measurement of heat and electricity consumption
Features
1x Lighting
1x Modbus
1x DALI
1x Photovoltaic
1x Boiler room
1x Energy monitoring
1x Jablotron
Hardware
Core | 1x |
Bus Extender | 1x |
32 UI module | 3x |
12 DO Module | 7x |
12 LED / OC Module | 3x |
Wind-Brightness-Temperature Sensor | 1x |
DALI Gateway | 2x |
DALI power supply | 2x |
Power Source 24V 100W | 1x |