Remote generator switching including regulation by inverters according to SOC - regulation of PV with a power of 90kWp with an accumulation of 90kWh with an LPG aggregate. - regulation of PV discharge up to 3x1000L accumulations with a power input of 3x27kW. - regulation of the entire boiler room, which is LPG, i.e. temperature control, three-way valves between LPG and AKU. - regulation of the intensity of internal lighting, including external lighting, based on production - binary control of lighting inside - switching off individual circuits based on production - opening gates and doors of individual sections - regulation based on weather prediction for 24H+ - measurement of heat and electricity consumption
Features
Lighting
1x Lighting
Modbus
1x Modbus
DALI
1x DALI
Photovoltaic
1x Photovoltaic
Boiler room
1x Boiler room
Energy monitoring
1x Energy monitoring